Second Half of the Final Third of the Coding Period


Although I was busy in uni stuff in the last fornight, I managed to get some work done in Download from fido search result implemented.

The ultimate objective was to move Database.fetch over to using Fido. Oh, and to fix everything that broke, after a horrible rebase.

So now, that PR is under review, and should get merged soon.

Somebody (prolly me) will have to migrate the now website to the new theme pretty soon. Also I would get the Quick Examples for the database package PR merged as soonas I get time.


With this, the GSoC period officially draws to a close, and what has been (and will continue to be) a wonderful journey.



First Half of the Final Third of the Coding Period

Eh so slight change in plans.


DISCOVR implementation has been delayed, and I’ll do it in December. Which means 2 things :

  • I’m not gonna forget about it. It is officially in my December todo list.
  • I’m potentially gonna ruin people’s holidays. >:D

Hence during this period, I mostly worked on getting 2 of my PRs merged.

BTW SunPy released 0.8 during this time.

These are the not-so-small PRs which got merged :

So I now enter the final fortnight of GSoC, with a lot of documentation to do for the webapp, and the mighty Download from fido search result implemented PR awaits.


Second Half of the Second Third of the Coding Period


So the next fortnight ends. Lots of work done and progress made. I digressed from the proposal and completed (almost 😛) what was supposed to be done after the 2nd evaluation. I completed the website with all cronjobs and all clients working. Imaging and timeseries data both work, with timeseries having interactive plots, thanks to ehsteve.


After a lot of head-banging and PR reviewing, and responding to reviews, SRS Reader and VSO query block level caching are finally ready to be merged. I must admit, that Fido indexing PR is really useful for people. 😀

So officially, the only thing that remains is implementing a client for DISCOVR, and displaying its timeseries data on the website.



First Half of the Second Third of the Coding Period

There is always this guy at every SunPy meet 😛


Well, this has been a busy fortnight to be honest. I got caught up with other stuff, and hence I need to play catch up.

So I fixed the SRS (now my to-do list has all boxes checked 🙂 ).

Persistent storage in the webapp works on my PC. (Note that the previous line is poorly worded.)

Now I’m thinking of making slight changes to plans, and I plan to get the webapp done as quickly as possible, with DSCOVR implementation towards the end of GSoC.

Oh, and btw VSO query block level caching is finally getting merged.




Second Half of the First Third of the Coding Period


I know. I know. Lets face it. I’m not gonna come up with good headings this year also. :/

So, I’m back at uni now, and (proper) work begins.

I start by fixing up the issue with the SRS reader, caused by past year’s files being tarred up. Oh yes, that took some fixing. That threaded downloader is tricky to deal with.


Now, to break a break from SRS (still I have to fix the missing columns issue), I start with the website. For starters, I need to take an input date, and serve the magnetogram plot of that day with AR locations marked on it. Simple, right ?


Deployment server hates you.

The website is a Flask app, deployed using dokku. The app works fine on my PC, but on the server, hehe. It’s still not working as it should, as plotting the magnetogram takes > 60 seconds (coz of downloading and stuff) and the timeout issue still persists.

Well, its deployed on Construction in progress 😛



First Half of the First Third of the Coding Period


I know. A better heading must be given. 😆

So the Coding Period has begun, aaaaand it’s time for me to head home from uni, after a long time. 🙂 😛

This means there was a lot of travelling, eating and lazing around ……..  😎

Hence, very little work was done in this fortnight.

Very little = Fixing number in SRS files with dates after 2002-06-15 = Adding 10,000 to a row




It’s already time?


Final Evaluation (Students) begins and I have done ZERO documentation  😎

13321725_1210674145618895_8435463368876576031_nSo, frantic work ensues, Cadair is disturbed multiple times while he is on vacation, and I manage to get (most of) my documentation done by 22nd.Finally I make my product submission, 1 day before the deadline 😀

Product Submission link : GSoC product submission

Now I await the final verdict…